Steel Roof, Tripsdrill
Project: New stell roof, Tripsdrill
Owner: Familiy Fischer
Time Period: 2019–2020
Total Costs: € -
Volumen: - m³
Provided Services:
- Support structure planning according to HOAI § 51, Lph 1-4 (by order of Ingenieurgesellschaft Klein)
Construction Details:
- Steel roof construction, designed as frame
- Longitudinal reinforcement through roof and wall composite constructions, and connection to solid construction
- Foundation through isolated and strip footings