Deutsch English

EXPERIENCE,
PROFESSIONAL SKILL AND KNOW-HOW

First-hand
expertise.

B29 cross-town link, Schwäbisch Gmünd

B29 cross-town link, Schwäbisch Gmünd

Building project: B29 cross-town link in Schwäbisch Gmünd - cutting and tunnel (west) with bridge, and ramp B

Client: Regional Council of Stuttgart

Period: 2007 - 2013

Total costs: approx. €26.7 million

Total length: 400 m

Services:
  • Project and support structure planning
  • Technical facilities
Construction:
  • 4-lane groundwater trough (watertight construction)
  • In a deep watertight excavation
  • Covered with a pre-stressed concrete bridge
  • Open cut tunnel (western section)

 

Back

TOP