Deutsch English

EXPERIENCE,
PROFESSIONAL SKILL AND KNOW-HOW

First-hand
expertise.

Kultur Weir, Kehl

Kultur Weir, Kehl

Building project: Kultur Weir, Kehl

Client:
Regional Council of Freiburg, Dienstsitz Offenburg

Period: 2009 - 2012

Services:
  •  Due to the introduction of new standards and the accompanying set of rules specific to hydraulic engineering (e.g. DIN 19700 and DIN 19702) assessments were now to adopt the semi-probabilistic safety concept. As part of the renovation of the weir at Kehl (built in 1977), Harrer Engineering were commissioned to assess the its stability based on the newly introduced standards and in consideration of the structure's condition. In addition to this, concrete repair measures were carried out at numerous points in accordance with the Additional Technical Terms of Contract - Hydraulic Engineering (ZTV-W), Lb.215 and Lb.219.
Construction:
  • Reinforced concrete structure
Particulars:
  • Structure with over 1000 tendons pre-stressed in numerous directions

 

Back

Current projects

Gamma-Bestrahlungsanlage, Bruchsal
Gamma iradiation facility, Bruchsal
> more
A81 Autobahn Immensitz Bridge
A81 Autobahn Immensitz Bridge
> more
NPP Obrigheim
NPP Obrigheim
> more
Timber Bridge, Crailsheim
Timber Bridge, Crailsheim
> more
Kultur Weir, Kehl
Kultur Weir, Kehl
> more
TOP