Deutsch English

EXPERIENCE,
PROFESSIONAL SKILL AND KNOW-HOW

First-hand
expertise.

Neckar Bridge, Zwingenberg

Neckar Bridge at Zwingenberg

Building project: New construction of a foot and cycle bridge with car access

Client: Municipality of Zwingenberg am Neckar

Period: 1999, 2005 – 2011

Services: 
  • Feasibility study and preliminary design   
  • Design and tendering  
  • Structural examination   
  • Construction management  
  • Precautionary preservation of evidence of the bordering area as well as the access roads within the scope of the bridge construction
Construction:
  • Cable-stayed bridge in steel design with single-lane road traffic
Particulars:
  • Intricate design despite road (Load Model 1) and river traffic (problem of barge collision) demands 
  • Difficult assembly above a main road and main shipping lane as well as floating the middle section into position with a pontoon  
  • Elaborate hillside stabilization in geologically unstable area

 

Back

Current projects

Reclamation of nuclear contaminated site
Reclamation of nuclear contaminated site
> more
Post Galerie, Karlsruhe
Post Galerie, Karlsruhe
> more
Hall Testing
Hall Testing
> more
Neckar Bridge, Zwingenberg
Neckar Bridge at Zwingenberg
> more
TOP