Official opening of the footbridge in Adelsheim
After a building period of around two years and as part of the removal of the level crossing, a footbridge with barrier-free access to the station platforms was erected. The technical challenges were well mastered and with its suitable visual appearance the bridge makes an important contribution to the growing infrastructure in Adelsheim.